Cost-Share Program Application Checklist
Cost-share programs pay part of a practice's cost, but almost never after the fact. Timing and paperwork decide who gets funded.
How cost-share works
Programs such as NRCS's Environmental Quality Incentives Program (EQIP) reimburse a share of the cost of approved practices, such as fencing, water systems, prescribed grazing, and manure storage. You apply, the agency ranks applications, and funded applicants sign a contract. You usually have to wait until the contract is approved before starting the work, and payments follow after the practice is completed and inspected.
Before you apply
- Visit your local USDA Service Center and ask about current signup periods, since many programs take applications year-round but fund in batches.
- Have your farm number and records with FSA.
- Confirm you control the land through ownership or a lease long enough to cover the contract.
- Discuss a conservation plan with the NRCS planner.
- Ask which practices rank well in your county, such as grazing systems or water developments.
Documents to gather
- Farm and tract numbers
- Map of the area with fields and fences marked
- Photos of current conditions
- Proof of ownership or lease agreement
- Contractor quotes, if the practice is built by a contractor
- Tax identification information and entity documents
- Any conservation or grazing plan already done
Do not start early
Beginning work before approval can make that practice ineligible. Ask whether a waiver exists, and get it in writing.
Application checklist
| Step | Date | Done |
|---|---|---|
| Contact NRCS and FSA | ____ | ____ |
| Complete conservation planning | ____ | ____ |
| Submit application | ____ | ____ |
| Ranking cutoff | ____ | ____ |
| Review and sign contract | ____ | ____ |
| Start work after approval | ____ | ____ |
| Request inspection and payment | ____ | ____ |
Budget realistically
Cost-share rarely covers 100 percent of a practice. Rates vary, and some programs offer higher rates for beginning, limited-resource or socially disadvantaged producers. Make sure you can pay upfront and wait for reimbursement, or ask a lender about bridging.
Maintain the practice
You will normally be required to maintain the practice for a set number of years. Keep fences repaired and water systems working, and keep records in case of a spot check.
Common mistakes
- Waiting until deadline week
- Choosing a contractor without comparing quotes
- Building before approval
- Ignoring maintenance requirements
Worked example
A producer wants to install 6,000 feet of high-tensile perimeter and cross fence plus a pipeline and two tanks. She gets two contractor quotes, writes down both, files an application before the ranking date and waits for approval before ordering material. The program pays a share of the approved cost, and she pays the rest and the extra costs it excludes, such as her own labor for brush clearing. Having the second quote on file shows the price is reasonable and speeds inspection.
Ask at the first visit
What practices does the county prioritize? How long between application and contract? What are the payment limits per person?
Authoritative references
General information only. Rules, programs and animal-health protocols change and vary by state; confirm details with your veterinarian, local Extension office or the agency named before you act.